The Office Buildout Technology Checklist.
58 questions. 6 construction-phase stages. Under 25 minutes.
Most buildout technology problems aren't installation problems — they're decisions that weren't made, or weren't made early enough. Cabling that wasn't specified into the construction documents. Conference rooms sized without accounting for display distance. Power in the wrong place because nobody asked.
This checklist is organized the way a buildout actually happens: by construction phase, not by IT category. You'll work through it in the same sequence your project moves through — from before the lease is signed all the way through the first 30 days after move-in.
It's written to be useful whether you end up hiring us or not. Most of it is generic across vendors and project types, so feel free to forward it to your GC, architect, or project team.
Format 18-page PDF
Time to complete ~25 minutes
Delivered Instantly + by email
What's in it
- ✓Before you sign the lease
- ✓Design phase
- ✓Pre-construction
- ✓During construction
- ✓Pre-occupancy
- ✓First 30 days after move-in